FLOATING YARD · CONTRACT 03
Stack a signal
for the storm.
One moving crane. Three beacon contracts. Drop each steel section with exact overlap before Big Bass turns the harbor into a wave tank.
Report to the crane →PRECISION REQUIRED
YARD BRIEFING
Steel obeys
the overlap.
- 01
Watch the hook
The crane crosses the full gantry. Release only when the suspended section is centered over the last layer.
- 02
Lose the overhang
Any unsupported steel is cut away. The tower becomes permanently narrower after every imperfect drop.
- 03
Brace for the wake
At four-layer intervals, Big Bass jumps. The next lift runs faster until the harbor settles.
CRANE CONTROL · LIVE
Drop clean.
Keep it standing.
The suspended section travels automatically. Tap, click, or press Space to release it. Only the overlapping steel remains; miss the tower and one safety bolt is gone.
BEYOND THE FOG HORN
The harbor's
unofficial inspector.
Every completed beacon attracts the same enormous bass. It circles once, strikes the surface, then disappears beneath the pontoons—as if testing whether the tower deserves to remain.
Return to crane control ↑